Main INDEX
Monthly INDEX
PREV
NEXT
User name lkaufman
Log entry time 00:02:52 on July12,2004
Entry number 128318
keyword=Swing shift summary
Swing Shift Summary
First hour of shift was the end of HAPPEX beam setup where Kent and Lisa were
taking data in the injector.
Switched to IHWP OUT before starting our data taking for this shift:
Production Runs:
IHWP OUT
2800
2803
2804 - compton tuning during run
2805
2806
IHWP IN
2807 - junk because IHWP changed, but not "flippered"
2808 started
Profile Scans
2801 - forgot to turn PMT HV on
2802 - good scan
Controlled access at 20:50 for fixing the Compton photon detector.
Sirish was done about 21:14, so we were ready for beam. Accelerator was down,
but brought beam back about 10 minutes later.
Began a Compton run at 22:03 - run 8629, IHWP OUT.
IHWP state was changed around 23:18. I forgot to end the Compton run before
changing the IHWP, but I ended the run right after the IHWP change (Compton Run
8629).
After this, I started a new Compton run, 8630, IHWP IN.