• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name lkaufman

    Log entry time 00:02:52 on July12,2004

    Entry number 128318

    keyword=Swing shift summary

    Swing Shift Summary
    
    First hour of shift was the end of HAPPEX beam setup where Kent and Lisa were 
    taking data in the injector.
    
    Switched to IHWP OUT before starting our data taking for this shift:
    
    Production Runs:
    
    IHWP OUT
    
    2800
    2803
    2804 - compton tuning during run
    2805 
    2806
    
    IHWP IN
    
    2807 - junk because IHWP changed, but not "flippered"
    2808 started
    
    Profile Scans
    
    2801 - forgot to turn PMT HV on
    2802 - good scan
    
    Controlled access at 20:50 for fixing the Compton photon detector.
    Sirish was done about 21:14, so we were ready for beam.  Accelerator was down, 
    but brought beam back about 10 minutes later.
    
    Began a Compton run at 22:03 - run 8629, IHWP OUT.
    
    IHWP state was changed around 23:18.  I forgot to end the Compton run before 
    changing the IHWP, but I ended the run right after the IHWP change (Compton Run 
    8629).
    
    After this, I started a new Compton run, 8630, IHWP IN.