02:00 waiting for the beam we acquire some pedestal run
start run 2872 pedestal
03:03 start run 2873 pedestal
03:18 MCC call:they are ready to send some beam to check orbit
tried to put BeO target, problem with target mouvement.
reebooted target IOC
03:44 ask for beam :few micro to check
03:45 left arm spectrometer lost control:rebooted; cycled Q2 and Q3
waiting for dipole set back
03:55 beam on BeO target seems all O.K., put back Hydrogen target on beam; left dipole still ramping
03:59 start run 2874 pedestal
04:11 37 microA on target, checked spot:O.K.,left dipole still ramping
04:15 left dipole problems (see log entry), solved setting manually the current.
Probably the problem was due to the fact that, when rebooted the
left arm spectrometer IOC, the NMR regulator control remained off. Is it a fault or is done on purpose ? Switched on the NMR regulator, all seems O.K.
04:39 start run 2875 production
05:35 start run 2876 production
06:30 start run 2877 production
07:19 stopped run, start Moller measuremet