    User name S. Frullani

    Log entry time 07:54:22 on July15,2004

    Entry number 128600

    keyword=shift summary

    02:00 waiting for the beam we acquire some pedestal run
    start run 2872 pedestal
    03:03 start run 2873 pedestal
    03:18 MCC call:they are ready to send some beam to check orbit
    tried to put BeO target, problem with target mouvement.
    reebooted target IOC
    03:44 ask for beam :few micro to check
    03:45 left arm spectrometer lost control:rebooted; cycled Q2 and Q3
    waiting for dipole set back
    03:55 beam on BeO target seems all O.K., put back Hydrogen target on beam; left dipole still ramping
    03:59 start run 2874 pedestal
    04:11 37 microA on target, checked spot:O.K.,left dipole still ramping
    04:15 left dipole problems (see log entry), solved setting manually the current.
    Probably the problem was due to the fact that, when rebooted the
    left arm spectrometer IOC, the NMR regulator control remained off. Is it a fault or is done on purpose ? Switched on the NMR regulator, all seems O.K.

    04:39 start run 2875 production
    05:35 start run 2876 production
    06:30 start run 2877 production
    07:19 stopped run, start Moller measuremet