    User name Reitz

    Log entry time 16:02:37 on July20,2004

    Entry number 129059

    keyword=Shift summary

    8:00 took over in production mode,
    .....beam 1/2 wave plate out, 36uA
    9:00 beam away for beam studies
    .....turned off bmw and parity feedback, kcoda
    .....and started it again
    9:xx quick access for Compton
    10:xx asked for another controlled access to work on
    ......profile scanners
    11:00 got notice that septum controls are not working,
    ......reboot did not improve the situation, Techs are on
    ......their way
    13:00 beam back, septa are back up, too
    14:00 Lisa wants to play with the beam (measuring charge
    ......asym./IAslope with Hall C on)
    16:00 asked MCC for bleddthrough measurement
    next shift takes over


    run 2990: production (IHWP out) 100k (continued from previous shift)
    run 2991: production (IHWP out) 90k

    run 2992: pedestal run
    run 2993: junk
    run 2994: junk
    run 2995: production ... IHWP remains OUT 50k, beam charge asy. large
    run 2996: beam charge asym measurement
    run 2997: production (IHWP out) 100k
    run 2998: production (IHWP out) 100k