• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name P. Monaghan

    Log entry time 08:02:41 on July22,2004

    Entry number 129240

    keyword=owl shift summary


    ♦ owl shift summary - 07/22/04 ♦

    left HRS mom = 2.9710 GeV/c
    left Sep set = 275.50 A
    left Sep red = 275.25 A
    rght HRS mom = 2.9600 GeV/c
    rght Sep set = 275.35 A
    rght Set red = 274.25 A

    2313:0009 run 3029, 100k, IHWP = OUT, production
    0009:0015 toggled IHWP, OUT → IN, see halogs 129201 & 129202
    0015:0111 run 3030, 100k, IHWP = IN, production
    0018:0023 reduced beam current 36.5 µA → 36.0 µA → 35.5 µA and bleedthrough = 0.87%, see halogs 129205 & 129206
    0112:0207 run 3031, 100k, IHWP = IN, production
    0138 bleedthrough = 0.45%, halog 129212
    0206:0221 RQ1 trip at the end of run 3031, halog 129211
    0221:0317 run 3032, 100k, IHWP = IN, production
    0241 checked bpm gains, halog 129213
    0317 bleedthrough = 0.94%, halog 129216
    0319:0414 run 3033, 100k, IHWP = IN, production
    0404:0411 QE measurement (elog 1225855), beamspot looks good after beam returns
    0414:0418 toggled IHWP, IN → OUT, see halog 129221
    0418:0514 run 3034, 100k, IHWP = OUT, production
    0515:0610 run 3035, 100k, IWHP = OUT, production
    0612:0638 run 3036, 48k, IHWP = OUT, production, ended early due to target
    0633:0648 reboot target IOC, halog 129233
    0648:0744 run 3037, 100k, IHWP = OUT, production
    0744 Unser temps recorded, halog 129238
    0745:0800 run 3038, xxxx, IHWP = OUT, production, in progress