• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Moffit

    Log entry time 14:35:29 on July22,2004

    Entry number 129291

    keyword=Summary of Helicity Magnet Commissioning Runs.

    Assisted Joe Grames with some commissioning of the helicity corrector magnets in the injector, by running our HAPPEX DAQ in the "Beamline" configuration.
    
    Here's a summary of what went down...
    First... put both (Hall A and Hall C) IA cells to 5.
    
    Run     What
    ------------------------------------------
    3040    Baseline
    3041    0L01V   Even = 1000  Odd =     0
    3042    0L01V   Even =    0  Odd =  1000
    3043    0L02H   Even = 1000  Odd =     0
    3044    0L02H   Even =    0  Odd =  1000
    3045    0L03V   Even = 1000  Odd =     0
    3046    0L03V   Even =    0  Odd =  1000
    3047    0L03H   Even = 1000  Odd =     0
    3048    0L03H   Even =    0  Odd =  1000
       Changed Reported Helicity to "No Delay"
    3049    0L01V   Even = 1000  Odd =     0
    3050    0L01V   Even =    0  Odd =  1000
       Changed Reported Helicity to "8 cycles"
       Set IT=900, OS=1(0)
    3051    Checked BPM signals (Forced gain) and BCM ADC channel (HiGain)
       Set IT=900, OS=13(12)
    3052    Current scan (20-38uA... 2 cycles).
    3053    Baseline
    3054    0L02H   Even = 1000  Odd =     0
    3055    0L01V   Even = 1000  Odd =     0
    
       Set IT=13000, OS=1(0).
       Returned Injector BPMs to Autogain.  BCM ADC to LoGain
    
    
    HAPPEX DAQ back and ready for production data.