Log entry time 14:35:29 on July22,2004
Entry number 129291
keyword=Summary of Helicity Magnet Commissioning Runs.
Assisted Joe Grames with some commissioning of the helicity corrector magnets in the injector, by running our HAPPEX DAQ in the "Beamline" configuration.
Here's a summary of what went down...
First... put both (Hall A and Hall C) IA cells to 5.
Run What
------------------------------------------
3040 Baseline
3041 0L01V Even = 1000 Odd = 0
3042 0L01V Even = 0 Odd = 1000
3043 0L02H Even = 1000 Odd = 0
3044 0L02H Even = 0 Odd = 1000
3045 0L03V Even = 1000 Odd = 0
3046 0L03V Even = 0 Odd = 1000
3047 0L03H Even = 1000 Odd = 0
3048 0L03H Even = 0 Odd = 1000
Changed Reported Helicity to "No Delay"
3049 0L01V Even = 1000 Odd = 0
3050 0L01V Even = 0 Odd = 1000
Changed Reported Helicity to "8 cycles"
Set IT=900, OS=1(0)
3051 Checked BPM signals (Forced gain) and BCM ADC channel (HiGain)
Set IT=900, OS=13(12)
3052 Current scan (20-38uA... 2 cycles).
3053 Baseline
3054 0L02H Even = 1000 Odd = 0
3055 0L01V Even = 1000 Odd = 0
Set IT=13000, OS=1(0).
Returned Injector BPMs to Autogain. BCM ADC to LoGain
HAPPEX DAQ back and ready for production data.