Main INDEX
Monthly INDEX
PREV
NEXT
User name J. Singh
Log entry time 07:19:49 on July24,2004
Entry number 129525
keyword=Bleedthrough measurement = 1.15%
took the following bleedthrough measurements were made during the night:
0356 38.2% elog 1226318 (note that hall A beam current was 1 µA for Rob's studies)
0429 0.00% elog 1226325 (note that hall A beam current was 0.2 µA for Rob's studies)
0713 1.15% elog 1226353 (back to production running)
FIGURE 1