• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name V. Sulkosky

    Log entry time 20:35:20 on July27,2004

    Entry number 129835

    keyword=Lead septum heating Test III

    Septum stripcharts for lead target with beam position on BPMBx at
    -3 mm.  Beam current at 13 uA.  Between -40 and -10 minutes.  Due to
    several beam trips, we stopped the tests before we were sure the 
    temperatures had stabilized.
    
    Right Temps
    T1= 7.4
    T2= 6.25
    T4= 7.15
    
    Left Temps
    T1= 6.85
    T2= 5.3
    T4= 6.95
    


    FIGURE 1

    FIGURE 2