User name m. mazouz
Log entry time 16:07:17 on September25,2004
Entry number 131953
keyword=Shift summary
Shift summary
08:35 Ask MCC for beam permit.
08:43 Start of run 2575.
08:45 Keeping on with DVCS config in LH2.
09:03 End of run 2575 (8K events), no beam for most of this run.
09:21 Beam is back. Start of run 2576.
09:45 End of run 2576. Ask MCC for controlled access to check the move of the L.HRS (move to elastic configuration)
p0 moved to 4.15 GeV/c
10:15 L. HRS angle moved to 20.4
10:20 ask MCC for beam permit
11:10 not succeed to rich 4.15 GeV/c for the left dipole. Paged ED Folts.
11:35 Set the Left dipole current to 1701.00 Amps (manuelly). p0 goes to 4.15 GeV/c.
11:40 Ask MCC for 2.5 uA beam.
11:41 daq problem.
12:30 A. Camsonne fixed the daq problem.
12:41 Start of run 2580 (elastic configuration)
12:53 End of run 2580 (2020 events)
13:00 Start of run 2581
13:35 End of run 2581 (9K)
13:36 Call MCC and ask for 0.5 uA beam (Alex want to check the couting rates)
13:50 Ask for 2.5 uA
13:50 Start of run 2583
14:23 End of run 2583 (18K)
15:00 Ask MCC for a controlled access