    User name m. mazouz

    Log entry time 16:07:17 on September25,2004

    Entry number 131953

    keyword=Shift summary

    Shift summary

    08:35 Ask MCC for beam permit.
    08:43 Start of run 2575.
    08:45 Keeping on with DVCS config in LH2.
    09:03 End of run 2575 (8K events), no beam for most of this run.
    09:21 Beam is back. Start of run 2576.
    09:45 End of run 2576. Ask MCC for controlled access to check the move of the L.HRS (move to elastic configuration)
    p0 moved to 4.15 GeV/c
    10:15 L. HRS angle moved to 20.4
    10:20 ask MCC for beam permit
    11:10 not succeed to rich 4.15 GeV/c for the left dipole. Paged ED Folts.
    11:35 Set the Left dipole current to 1701.00 Amps (manuelly). p0 goes to 4.15 GeV/c.
    11:40 Ask MCC for 2.5 uA beam.
    11:41 daq problem.
    12:30 A. Camsonne fixed the daq problem.
    12:41 Start of run 2580 (elastic configuration)
    12:53 End of run 2580 (2020 events)
    13:00 Start of run 2581
    13:35 End of run 2581 (9K)
    13:36 Call MCC and ask for 0.5 uA beam (Alex want to check the couting rates)
    13:50 Ask for 2.5 uA
    13:50 Start of run 2583
    14:23 End of run 2583 (18K)
    15:00 Ask MCC for a controlled access