User name Higinbotham
Log entry time 16:01:03 on September27,2004
Entry number 132234
keyword=Shift Summary
BCM Calibration Data
--------------------
Started shift 2670 2.5 uA on LH2 with Raster Off
Put in BeO target to check raster settings and setup for a 2x2 raster.
The morning was spent doing the BCM vs. HRS rate runs
(see log #132209 for the list of runs and conditions)
Around noon Alex started working with the DAQ.
At 12:50 we called for an controlled access to change the polarity
of the left HRS.
At the end of the shift, the spectrometer was ready to go but people
are still working on the DVCS DAQ.