    User name Carlos

    Log entry time 00:04:37 on October 5,2004

    Entry number 132996

    keyword=Swing shift summary

    Swing shift summary:
    ======================

    16:00 Running smoothly on LH2.

    17:00 ROC18 not responding. TS1 reset (with the HallA tools buttons) and ROC18 rebooted. Then it worked.

    17:45 ROC18 not responding. Couldn't reboot. Crate was reset throught the remote switch.

    20:00 Beam was oscillating vertically around 200um in BPM4B. Moved to empty target and made harp scan. Results look reasonable (see HALOG entry).

    22:15 Two arms run.

    22:20 MMC called. One magnet down. 30min estimate.

    22:25 LED scan (run 3129)

    22:50 Accelerator still down. Estimate 15min. LED scan with XY position EPICS variables. Run 3131.

    23:30 Beam back. Finished TWOARM runs. 100K events more.

    23:38 Back to production runs on LH2.