• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Mazouz

    Log entry time 23:58:14 on October 7,2004

    Entry number 133343

    keyword=Shift summary


    New crew on shift: Eric Voutier/Malek Mazouz, Bodo Reitz,
    ------------------ Eugen Chudakov

    Going back to dta production after recovery of the dipole.

    Set spectrometer and DVCS detector for kinematics #1 at 1.5 GeV2

    Beam back / HARP check / position check

    MUX study (Alexandre)

    Two arms run

    Optics measurement

    DVCS current check and nicely low

    NO BEAM between 20:45 and 22:07

    22:10 HARP scan OK. 2.75% bleedthrough check.

    Run History
    -----------

    3254 two arm / junk
    3255 two arm / good run
    3256 junk
    3257 optics / junk
    3258 optics / good run
    3259 DVCS / production run (100k), Start at 17:30 (LH2 target, I=2.5uA)
    3260 DVCS / bad run ROC18 crashes / kcoda / reboot
    3261 DVCS / production run (100k)
    3262 DVCS / production run (100k)
    3263 DVCS / production run (100k)
    3264 DVCS / production run (100k), Calo HV change
    3265 DVCS / production run (65k)
    3266 DVCS / production run, No beam for most of this run, Calo HV change (same as before)
    3267 Junk
    3268 DVCS / production run (100k)
    3269 DVCS / production run (100k)
    3270 DVCS / production run (100k)