Shift Summary
---------------
00:20 : Target moved to LH2. Ask MCC for 3 uA.
00:23 : Alex started MUX tests
01:00 : MCC want a controlled access to the hall because of an alarm in the beam dump humidity detector.
01:33 : beam is back. Continue MUX tests.
02:06 - 03:16 : bad runs (3691-3694) with DVCSMUX configuration (PA HV, and Calo-PA pedestals not good for some blocs)
03:30 - 04:35 : No beam because of optics problem in hall B. Pedestal run (3698) with DVCSPed configuration
04:35 - 05:45 : Alex continues working on the MUX to fix pedestals problem.
------------------
production runs LH2 target, I=3 uA, DVCSMUX configuration :
05:23 - 05:58 : run 2709 (200k)
05:58 - 06:31 : run 3710 (160k)
06:31 - 07:13 : run 2711 (200k)
07:30 - 07:48 : run 2714 (78k)
---------------------
TWOARM runs 2712 and 2713 (optics target) (07:14 - 07:25)