User name A. Camsonne
Log entry time 16:03:07 on October19,2004
Entry number 134726
keyword=Day shift summary
Day shift summary
8:44 MCC has trouble delivering beam... beam away for a couple of minutes
8:55 beam back
10:33-10:48 Two arms runs
10:52 back to production
1:30 MCC called expert to look at some problems, estimate time needed is 15 minutes
1:45 Beam came back shortly but it seems the problem is still there
1:58 MCC called they need to repair something time estimate in 30 to 40 minutes, so starting LED calibration
14:10 MCC called they said they could resume beam so going back to data taking settings
14:12 start of run 3950
14:20 Bleedthrough measurement 2.59%
15:21 Dummy target 4 cm run
15:37 Dummy target 15 cm run
16:00 Run DVCS 3953 running... for the next shift
Run list
DVCS production
Run Number: 3941 150k events
BCM u10[0]:0.007913
Run Number: 3942 150k events
BCM u10[0]:0.008033
Run Number: 3943 150k events
BCM u10[0]:0.00798
Run Number: 3946 150k event
BCM u10[0]:0.007903
Run Number: 3947 150k event
BCM u10[0]:0.007999
Run Number: 3948 38 k events
BCM u10[0]:0.002034
Run Number: 3949 short run ( no beam )
Run Number: 3950 150k event
BCM u10[0]:0.008101
Two arms runs
Run Number: 3944
BCM u10[0]:0.0007092
Optic run
Run Number: 3945
BCM u10[0]:0.0008098
Dummy target runs
Run number 3951 Dummy 4 cm
Run number 3952 Dummy 15 cm