    User name A. Camsonne

    Log entry time 16:28:41 on October21,2004

    Entry number 134886

    keyword=Day shift summary

    8:00 Beams stops for us.
    HV from DVCS detector all off.
    MCC starts beam studies
    Spectrometers ramping down

    8:55 MCC called and asked if they could use the raster since we are on empty target there is no problem with the raster.

    11:00 Hall to controlled access to change kinematic



    12:00 Start of UV lamp curing on block 121
    Led runs taken before run 4002

    14:41 Turned off curing lamp Run LED taken 4003

    15:30 Beam into the hall
    Compton tuning starts, tune looks pretty good
    vertical scan

    16:00 End of shift