User name Carlos
Log entry time 07:54:38 on October23,2004
Entry number 135033
keyword=Owl shift summary
Shift crew:
------------
Munoz Camacho
Ferdi
Feuerbach
Shift summary:
---------------
00:00 Shift started with beam and running production.
01:55 Bleedthrough measurement: 1.98%
03:15 Asked MCC to adjust beam position in BPM4B-Y to 1.4 (was reading 1.1).
04:30 MMC called. Magnets problems. Beam is expected to be quite unstable. Experts have been called. Beam pretty stable from 5am.
05:54 Asked MMC to stop the beam in order to perform an LED run.
06:34 Back to production running.
Running production all night, except for 40min BANU for LED run.