Main INDEX
Monthly INDEX
PREV
NEXT
User name Kelleher
Log entry time 09:26:09 on October28,2004
Entry number 135247
keyword=Cryo Levels -- Hall C cooldown
I noticed a serious decline in the heat output of the HPH and paged the target expert. There was also a slight increase in the temperature of the 15 K coolant, so I called MCC.
Hall C is performing a target cooldown which is resulting in fluctuations in our 15 K flow and supply temperature.
I have turned down the fans to 10% to reduce the heat load. The target temperarure seems fairly stable