    Log entry time 00:03:50 on October30,2004

    Entry number 135350

    keyword=shift summary

    16.00 no beam

    16.24 proton array HV switched ON

    ______________________________
    DVCS production kin#3

    16.25 start run 4171
    17.21 end run 4171

    17.22 start run 4172
    18.15 end run 4172

    18.18 calorimeter and proton array off
    raster on 2*2mm
    ______________________________
    BCMvsHRS calibration

    1 uA PS1=3 PS3=2 PS4=1
    18.20 start run 4173
    18.26 end run 4173

    2.5 uA PS1=7 PS3=5 PS4=1
    18.28 start run 4174
    18.35 end run 4174

    ask MCC for 5uA
    No beam ubtil 20.00
    from 20.00 to 20.40 no way to have more than 3.5uA
    Stop BCM calibration
    raster off
    ______________________________
    re start DVCS production kin#3

    20.52 HV ON for calorimeter and proton array

    20.56 start run 4176
    21.47 end run 4176

    21.48 start run 4177

    21.49 MCC call : they found the problem and now it's possible to have more than 3.5uA in hall A -> BCM calibration can be done.

    22.43 end run 4177
    start run 4178

    23.35 end run 4178
    23.36 start run 4179

    23.39 bleedthrough measurement : 1.98%








    FIGURE 1