User name Carlos
Log entry time 16:02:29 on October30,2004
Entry number 135416
keyword=Day shift summary
Shift crew:
============
C. Munoz Camacho
J. Roche
Shift summary:
===============
08:00 Shift started with DVCS production in progress.
08:59 Start of BCM calibration runs (see below and HALOG entry).
10:19 HRS Pedestal run while no beam available.
10:43 Back to DVCS production: kin#3 2.5uA, raster off.
12:54 Bleedthrough 1.25%
16:00 Still running production.
BCM calibration runs:
=====================
Run 4191 200k 1.0uA no raster PS1=7, PS3=5, PS4=1
Run 4192 200k 2.5uA raster 2x2mm PS1=7, PS3=5, PS4=1
Run 4193 200k 5.0uA raster 2x2mm PS1=14,PS3=10,PS4=2
Run 4194 200k 10.0uA raster 2x2mm PS1=28,PS3=20,PS4=4
Run 4196 200k 15.0uA raster 2x2mm PS1=42,PS3=30,PS4=6
Run 4198 200k 20.0uA raster 5x5mm PS1=56,PS3=40,PS4=8
Run 4201 4k 0.0uA PS1=7, PS3=5, PS4=1 (opportunistic while no/pulsed beam)
Run 4202 200k 2.0uA raster 2x2mm PS1=6, PS3=4, PS4=2
At 20uA, LH2 target temperature alarm went red when raster was 2x2mm. We increased the raster to 5x5mm.