• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name dhayes

    Log entry time 16:00:37 on November 7,2004

    Entry number 136065

    keyword=shift summary

    08:00 - 09:00 ended run 4447 59k events 8 beam trips subtracted from abu
    08:45 survey starts for controlled access.
    moved to LHRS: angle 19.32, p=2.95
    Dvcs angle=18.25
    Tagger in
    run 4448 test mux veto
    11:00 beam is back at 2.5 uA
    There was another access, when it was over the hall could not come up because of a key problem.
    The problem was a power supply in the PSS, they fixed it and had to sweep the hall again, finished near 16:00