keyword=shift summary
08:00 - 09:00 ended run 4447 59k events 8 beam trips subtracted from abu
08:45 survey starts for controlled access.
moved to LHRS: angle 19.32, p=2.95
Dvcs angle=18.25
Tagger in
run 4448 test mux veto
11:00 beam is back at 2.5 uA
There was another access, when it was over the hall could not come up because of a key problem.