    User name dhayes

    Log entry time 16:05:10 on November10,2004

    Entry number 136353

    keyword=shift summary

    08:00-09:00 18 beam trips, substracted 6 minutes from abu
    09:00-10:00 12 beam trips, substracted 4 minutes from abu
    10:00-11:00 15 beam trips, substracted 5 minutes from abu
    11:00-12:00 20 beam trips, substracted 7 minutes from abu
    12:00-13:00 16 beam trips, substracted 5 minutes from abu
    13:00-14:00 18 beam trips, substracted 6 minutes from abu

    08:28 moved target to 15cm LD2, from optics, requested 4uA beam
    08:48 bleed thru is 1.63%
    10:00 stopped run 4552 because MCC reported beam would be off while they are fixing the laser.
    10:08 false alarm, beam is on, started run 4553
    12:54 bleed-thru is 1.56%

    runs 4549 and 4550 two-arm and optics
    4551 to 4558 production