keyword=shift summary
08:00-09:00 18 beam trips, substracted 6 minutes from abu
09:00-10:00 12 beam trips, substracted 4 minutes from abu
10:00-11:00 15 beam trips, substracted 5 minutes from abu
11:00-12:00 20 beam trips, substracted 7 minutes from abu
12:00-13:00 16 beam trips, substracted 5 minutes from abu
13:00-14:00 18 beam trips, substracted 6 minutes from abu
08:28 moved target to 15cm LD2, from optics, requested 4uA beam
08:48 bleed thru is 1.63%
10:00 stopped run 4552 because MCC reported beam would be off while they are fixing the laser.
10:08 false alarm, beam is on, started run 4553
12:54 bleed-thru is 1.56%
runs 4549 and 4550 two-arm and optics
4551 to 4558 production