User name Carlos
Log entry time 00:06:59 on November13,2004
Entry number 136503
keyword=Swing shift summary
Shift crew:
===========
C. Munoz Camacho
C. Ferdi
L. Weinstein
Shift summary:
==============
16:00 Shift started with production data on LD2.
16:15 MCC phoned. Problems in one zone. Down for at least 10min.
16:50 Beam back.
18:12 MCC phoned. Down of 45min-1h for maintenance.
18:21 HRS pedestal run.
18:25 DVCS pedestal run.
19:42 Beam back.
Beam less tripy.
22:09 TWOARM run on LD2.
22:14 Back to production data.
23:00 Calorimeter block 3 turned off (see halog entry), before the start of run 4612.
00:00 Shift ended running production on LD2.
Trips summary:
==============
Trips were taken into acccount for BTA, but I lost my hour to hour counts.
Run summary:
============
4603 Production LD2 300k (beam off in the middle of the run)
4604 Production LD2 207k (stopped early, beam off)
4605 HRS Pedestal 50k
4606 DVCS Pedestal 19k
4607 Production LD2 300k
4608 Production LD2 300k
4609 Production LD2 300k (Block 3 turned bad)
4610 TWOARM LD2 200k
4611 Production LD2 300k
4612 Production LD2 300k