    User name fieschi

    Log entry time 16:03:47 on November15,2004

    Entry number 136738

    keyword=shift summary


    9.50 no beam for 10 minutes : move target to optics target

    10.05 TWOARM run 4684 (many trips)
    10.21 TWOARM run 4685

    need to begin the radiation survey at 10.30 for controlled access at 11.00
    I go on taking data on optics target until 10.30 (3 TWOARM runs on optics target)

    target moved to LD2 target 15cm during radiation survey

    11.41 TWOARM run LD2

    compton polarimeter was off during all the shift (daq problem)


    runlist nDVCS production
    _________________________
    run charge (C)
    4681 0.009173
    4682 end of run empty
    4683 0.007973
    4689 0.009255
    4690 0.009212
    4691 0.009239
    4692 0.009245
    4693 0.009216
    4694 running


    beam trips
    __________________________
    8.00 -> 9.00 16*20s -> 5min
    9.00 -> 10.00 17*20s -> 6min
    10.00 -> 11.00 5*20s -> 2min
    11.00 -> 12.00 2*20s -> 1min
    12.00 -> 13.00 11*20s -> 4min
    13.00 -> 14.00 13*20s -> 4min
    14.00 -> 15.00 15*20s -> 5min
    15.00 -> 16.00 11*20s -> 4min