    User name Carlos

    Log entry time 03:37:55 on November24,2004

    Entry number 137501

    keyword=Owl shift summary


    Shift crew:
    ===========
    C. Munoz Camacho
    C. Ferdi

    Shift summary:
    ==============
    Smooth shift. Beam to Hall A was taken away at 3:26am.

    --------
    00:00 Shift started with production run 4973 underway.

    00:56 TWOARM run on LD2

    01:00 Moved target to OPTICS

    01:02 HRS pedestal run (50k) while target moves.

    01:08 Optics run with nDVCS coda configuration at 2.5uA.

    03:00 MCC called. Beam will be swith off in about 10min.

    03:18 Current went up to 3uA after a trip. I won't complain as they might really reduce it to 0...

    03:21 Current back to 2.5uA.

    03:23 Current ramping up to 3uA again.

    03:24 Back to 2.5uA.

    03:25 Back to 3.0uA.

    03:26 MCC called. A modulation on the beam current has been going on. They're gonna fix that: beam off to Hall A.

    03:29 DVCS pedestal run (10kevents)

    03:35 Shift "ended" with target at optics (multifoil) and no beam in the Hall.

    Happy holidays! Enjoy your dinner and sign up for shifts...


    Run summary:
    ============
    Run 4973: nDVCS production, 300kevents
    Run 4974: TWOARM on LD2, 200kevents
    Run 4975: HRS pedestals, 50kevents
    Run 4976: nDVCS on multifoil (2.5uA), 150kevents
    Run 4977: nDVCS on multifoil (2.5uA),

    Compton run summary
    ===============================
    Compton cavity not locking -> NEEDS FIXING


    Trip summary:
    =============
    00:00-01:00 19 trips (6min BNA)
    01:00-02:00 21 trips (7min BNA)
    02:00-03:00 16 trips (5min BNA)
    03:00-03:26 05 trips (2min BNA)