Main INDEX
Monthly INDEX
PREV
NEXT
User name fieschi
Log entry time 00:08:28 on December 1,2004
Entry number 137573
keyword=shift summary
19.50 HV calo swithed ON
20.15 problem with moller -> restore running configuration
target moved to hydrogen (15 cm)
20.20 harp scan -> OK
20.30 start elastic calibration run 4994 (4uA)
22.30 bleedthrough measurement
23.10 move Left HRS to 37.69 degree
momentum set to 2.381 GeV/c
elastic calibration
__________________________________
LHRS angle 36.48 degree, momentum : 2.489 GeV/c
DVCS angle -20.50 degree
___________________________________
4994
4995
____________________________________
LHRS angle 37.69 degree, momentum : 2.381 Gev/c
--------------------------------------
4996 running
Beam trip
________________________________________
20.00 -> 21.00 8*20s -> 3min
21.00 -> 22.00 18*20s -> 6min
22.00 -> 23.00 18*20s -> 6min
23.00 -> 00.00 24*20s -> 8min
compton
______________________
run pol
9748 74.3 %