    User name mazouz

    Log entry time 16:02:46 on December 1,2004

    Entry number 137606

    keyword=Shift summary

    Shift summary
    -------------
    08:00 - 10:00 : Controlled access for configuration change (kin#3 with the tagger and LH2 target)
    10:30 : Start taking data at 2.5 uA
    12:00 : No signals for B26 (tagger), asked for a 10min controlled access to check this channel. found a not trivial problem, so it will be repared tomorrow during beam studies.
    12:35 : Beam is back, continue to take data
    13:20 : Calo HV change (see Carlos entry). First good run.

    Nb Trips
    ---------
    08:00 - 10:00 : No Beam
    10:00 - 11:00 : 13 * 20s = 4min
    11:00 - 12:00 : 14 * 20s = 5min
    12:00 - 13:00 : 09 * 20s = 3min
    13:00 - 14:00 : 23 * 20s = 8min
    14:00 - 15:00 : 13 * 20s = 4min
    15:00 - 16:00 : 17 * 20s = 6min

    Run list
    --------
    2.5 uA beam and LH2 target
    6.4% DT and 25Hz counting rate

    run 5007 : DVCSMuxVeto config. first good run (75k).
    run 5008 : good run (75k)
    run 5009 : coda (TS1) crashed during this run.
    run 5019 : running...