    New Crew on Shift: Elena Kuchina, Lisa Kaufman, Eric Voutier
    -----------------

    8:00 ... arriving on shift while run 5027 is running.

    9:30 Moving to LD2 target

    9:40 After tuning the beam intensity, take data on LD2@kin3 till
    the beam is gone, the signal is comparable to kin2 signal
    but still surprisingly better in term of S/N ratio

    10:05 Beam studies, went to controlled access

    15:54 Move to optics target

    16:00 Beam is BACK IN TIME !!!!!!!

    Contolled access
    ----------------
    - Acces to the hall to solve the B26 problem; opening the ears and
    checking the connections; check signals of the PMTS and everything
    looks good after putting back everything in place; next run will
    check this with data.
    - Problem: while moving the left spectrometer, there has been an
    interference between HRS and the DVCS platform... the DVCS platform
    was moved by the HRS for several degrees which has been sqeezing
    the big groung cable running on the spectrometer. It was checked by
    Ed who concludes that it was ok.

    Run history
    -----------
    run #5027, 15cm LH2, DVCSmuxVETO, 75k good run
    run #5028, 15cm LH2, DVCSmuxVETO, 75k good run
    run #5029, 15cm LD2, DVCSmuxVETO, 75k good run

    Trip summary
    ------------

    8:00- 9:00 --> 24 * 20s = 8 mn
    9:00-10:00 --> 18 * 20s = 6 mn