User name Eric Voutier
Log entry time 16:03:19 on December 2,2004
Entry number 137669
keyword=Shift summary
New Crew on Shift: Elena Kuchina, Lisa Kaufman, Eric Voutier
-----------------
8:00 ... arriving on shift while run 5027 is running.
9:30 Moving to LD2 target
9:40 After tuning the beam intensity, take data on LD2@kin3 till
the beam is gone, the signal is comparable to kin2 signal
but still surprisingly better in term of S/N ratio
10:05 Beam studies, went to controlled access
15:54 Move to optics target
16:00 Beam is BACK IN TIME !!!!!!!
Contolled access
----------------
- Acces to the hall to solve the B26 problem; opening the ears and
checking the connections; check signals of the PMTS and everything
looks good after putting back everything in place; next run will
check this with data.
- Problem: while moving the left spectrometer, there has been an
interference between HRS and the DVCS platform... the DVCS platform
was moved by the HRS for several degrees which has been sqeezing
the big groung cable running on the spectrometer. It was checked by
Ed who concludes that it was ok.
Run history
-----------
run #5027, 15cm LH2, DVCSmuxVETO, 75k good run
run #5028, 15cm LH2, DVCSmuxVETO, 75k good run
run #5029, 15cm LD2, DVCSmuxVETO, 75k good run
Trip summary
------------
8:00- 9:00 --> 24 * 20s = 8 mn
9:00-10:00 --> 18 * 20s = 6 mn