• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Carlos

    Log entry time 00:47:42 on December 3,2004

    Entry number 137703

    keyword=Swing shift summary


    Shift crew:
    ===========
    C. Munoz Camacho
    H.S. Jo

    Shift summary:
    ==============

    Recovery from beam studies quite fast. Optics+TWOARM and nDVCS production the rest of the shift.

    -----

    16:00 Shift started with recovery from beam studies.

    16:30 Harp scan: results within the specifications.

    16:43 Optics run.

    16:49 Target moved to LD2.

    16:57 TWOARM run on LD2.

    17:01 Start of nDVCS production at 4uA.

    18:55 Bleedthrough measurement: 0.37%

    23:41 TS1 crashed at the end of run 5043. Rebooted.

    23:43 Bleedthrough measurement : 0.20%

    00:00 Shift finished running production on nDVCS.


    Run summary:
    ============
    Run 5033 : Optics run, 200kevents.
    Run 5034 : TWOARM LD2, 200kevents.
    Run 5035 : nDVCS production, 75kevents.
    Run 5036 : nDVCS production, 300kevents.
    Run 5037 : nDVCS production, 300kevents.
    Run 5038 : nDVCS production, 300kevents.
    Run 5039 : nDVCS production, 300kevents.
    Run 5040 : nDVCS production, 300kevents.
    Run 5041 : nDVCS production, 300kevents.
    Run 5042 : nDVCS production, 300kevents.
    Run 5043 : nDVCS production, 299kevents. TS1 crashed at the end.
    Run 5044 : nDVCS production, running...


    Compton run summary
    ===============================

    Run 9787 : Polarisation 77%, S/N=11.
    Run 9789 : Polarisation 75%, S/N=11.
    Run 9790 : Polarisation 77%, S/N=13.
    Run 9791 : Running...


    Trip summary:
    =============
    00:00-01:00 14 trips (5min BNA)
    01:00-02:00 11 trips (4min BNA)
    02:00-03:00 15 trips (5min BNA)
    03:00-04:00 10 trips (3min BNA)
    04:00-05:00 09 trips (3min BNA)
    05:00-06:00 12 trips (4min BNA)
    06:00-07:00 09 trips (3min BNA)
    07:00-08:00 15 trips (5min BNA)