• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Carlos

    Log entry time 00:15:36 on December 4,2004

    Entry number 137799

    keyword=Swing shift summary


    Shift crew:
    ===========
    C. Munoz Camacho
    C. Hyde-Wright

    Shift summary:
    ==============

    Production shift until about 10pm, when DAQ crashed.

    -------
    16:00 Shift started with production run 5064 underway.

    16:40 Asked MCC to tune BPM4B-Y from 1.2 to 1.4. They managed to do it without a single trip!).

    19:59 Bleedthrough measurement : 0.31%

    22:00 CODA crashed. Tried rebooting it. Paged Alex.

    23:55 Bleedthrough measurement : 0.58%

    00:00 Alex is working on DAQ problem.


    Run summary:
    ============
    Run 5064: nDVCS production, 300kevents
    Run 5065: nDVCS production, 300kevents
    Run 5066: nDVCS production, 300kevents
    Run 5067: nDVCS production, 300kevents
    Run 5068: nDVCS production, 300kevents
    Run 5069: nDVCS production, 300kevents
    Run 5070: nDVCS production, 300kevents
    Run 5071: nDVCS production, 300kevents
    Run 5072: nDVCS production, 20kevents. CODA crashed.


    Compton run summary
    ===============================

    Run 9801 : Polarisation 75%, S/N=18.
    Run 9802 : Polarisation 76%, S/N=11.
    Run 9803 : Polarisation 78%, S/N=12.
    Run 9804 : Running...


    Trip summary:
    =============
    16:00-17:00 09 trips (3min BNA)
    17:00-18:00 11 trips (4min BNA)
    18:00-19:00 17 trips (6min BNA)
    19:00-20:00 13 trips (4min BNA)
    20:00-21:00 13 trips (4min BNA)
    21:00-22:00 11 trips (4min BNA)
    22:00-23:00 12 trips (4min BNA)
    23:00-00:00 16 trips (5min BNA)