User name Carlos
Log entry time 00:22:06 on December 5,2004
Entry number 137908
keyword=Swing shift summary
Shift crew:
===========
Munoz Camacho
Igarashi
Hyde-Wright
Shift summary:
==============
nDVCS production shift
--------
16:00 Shift started with production run 5107 underway.
19:45 TS1 crashed during run 5113. Coda cold start and reboot of all ROCs worked. 11min BANU.
22:10 DVCS IOC froze. Power-cycled.
22:22 Bleedthrough measurement : 0.60%
00:00 Run 5121 underway.
Run summary:
============
Run 5107 : nDVCS production, 300kevents.
Run 5109 : TWOARM LD2, 200kevents.
Run 5110 : nDVCS production, 300kevents.
Run 5111 : nDVCS production, 300kevents.
Run 5112 : nDVCS production, 98kevents. TS1 crashed.
Run 5116 : nDVCS production, 300kevents.
Run 5117 : nDVCS production, 300kevents.
Run 5118 : nDVCS production, 300kevents.
Run 5119 : nDVCS production, 300kevents.
Run 5120 : nDVCS production, 300kevents.
Run 5121 : nDVCS production, running.
Compton run summary
===============================
Run 9811 : Polarisation 76%, S/N=12.
Run 9815 : Polarisation 75%, S/N=9.
Run 9816 : Polarisation 77%, S/N=9.
Run 9817 : Running...
Trip summary:
==============
16:00-17:00 12 trips (4min BNA)
17:00-18:00 10 trips (3min BNA)
18:00-19:00 18 trips (6min BNA)
19:00-20:00 15 trips (5min BNA)
20:00-21:00 11 trips (4min BNA)
21:00-22:00 17 trips (6min BNA)
22:00-23:00 18 trips (6min BNA)
23:00-00:00 13 trips (4min BNA)