User name Lindgren
Log entry time 16:32:19 on January 8,2005
Entry number 138557
keyword=Shift Summary
08:00 Run No 1505 continuing. Stopped at 08:17.
08:18- 08:28 Run No 1506.
08:34-08:35 Run No 1507, stopped immediately.
08:36- 9:28 tried to see the problems in E-DE adc spectra and found some problem in BB-vme cards. Took controlled access and power cycled the BB-vme crate.
Run No 1508 was a cosmic-run in the Hall.
9:28-9:32 Run No 1509 at 1uA current
9:35-9:40 Run No 1510 at 2uA current
9:42-9:45 Run No 1511 at 3uA current
9:49-9:52 Run No 1512 at 3uA
9:56-10:09 Run No 1513 at 3uA
10:11-10:12 Run NO 1514 at 3uA
10:13-1025 Run No 1515 at 3.5uA
10:25 beam gone due to a problem in south linac.
11:00 Beam back on
start run 1516 at 11:06
11:06 - 11:17 Run 1516
11:22 - 11:34 Run 1517
11:35 - 11:42 Run 1518
11:42 - 11:48 Run 1519 Changed prescaler T6 to 100
11:49 - 11:57 Run 1520
11:58 - 12:06 Run 1521
12:08 - 12:15 Run 1522
12:16 - 12:25 Run 1523
12:32 - 12:39 Run 1524
12:41 - 12:47 Run 1525
12:48 - 12:56 Run 1526
12:57 - 13:10 Run 1527
13:13 - subtract 60 V from HV of lE2; add 60 V to lE3; run 1528
13:13 - 13:27 Run 1528
Beam off for a fopt
13:35 Beam is back
High Voltages in EL and ER adjusted to put the energy loss peak about 1000+-100 chanels above the pedestal. Finished at 14:20.
14:25 Computer crashed. Tried to reboot by resetting Trigger supervisor and ROC3 and ROC4. ROC4 would not reboot.
Bodo suggest to make an access to recycle fast bus roc4 crate. Doug agrees. MCC has been notified.
15:00 PM Ron and Bodo entered Hall A to Recycle ROC4 power supply.
Started Run 1531 from the Hall as a check to be sure it is working.
15;38 Hall A back in Beam permit
15:49 Beam back on target 3.4 ua.
Run 1532 - Run 1533 Not useful runs.
Run 1534; changed BB HVs for dE tubes, such that all signals will peak 300+-50 channels above pedestal.
Run 1536; first good run to check changes of HV on E abd dE.