Main INDEX
Monthly INDEX
PREV
NEXT
User name Lindgren
Log entry time 17:04:19 on January11,2005
Entry number 138971
keyword=Day shift summary
Day shift summary: Tuesday 11 Jan 2005
kinematics set for H(e,e'p) in HRS_left and neutron detector
neutron detector at 50 degrees and 15 m.
08:00 Determining adjusted HV levels on the neutron detector (Peter M and Eli P)
08:00-09:00 runs 1690-1693
change the HV levels
09:27 start run 1694 w/new HV levels
9:30-10:00 runs 1694, 1695
change HV levels
10:10 start run 1696
10:22 start run 1697
vary HV levels between runs 1697, 1698 and 1699
10:50 set final HV levels
10:55 start run 1700 (250K events)
11:10 run 1701 (124K events) ended early at 11:20 to allow more time for the sieve slit run
11:22 put in sieve slit
11:25 sieve collimator sticks. back up a little and then try again.
sieve collimator at 0.3698 (0.4mm off)
11:28 start run 1702
increase beam current to 3.5 uA
11:33 increase beam current to 4.5 uA (unrastered on LH2 target)
12:15 end run 1702 with 61K events
reduce beam current to 2.5 uA
remove sieve slit
change to T7 only trigger with ps7 prescale at 64K
12:17 start run 1703
64K is too high a ps factor. change ps7 to 10K
this will give 300 Hz for trigger 7
12:20 start run 1704
12:30 end run with 250K events
That's it for beam for this shift.
Next up: move the neutron detectors and the HRS and change HRS polarity.
Neutron detector moved to 99 degrees and positioned behind BigBite
2 inch think lead shield moved and bolted into place in front of neutron detector
4:05 Techs out of Hall
Request beam permit
16:30 Going down to fix channels and power cycle - ROC4