Main INDEX
Monthly INDEX
PREV
NEXT
User name Ran
Log entry time 23:53:56 on January11,2005
Entry number 139027
keyword=shift summary
17:00 asking MCC for Beam (done with all fixin the Hall)
(needed to power cycle ROC4 and re-route N1-1L HV channel from 4.0L
to 7.11U due to short-cut in cable.)
17:20 - got Beam
17:38 finished tilted carbon run with 250000 events
18:40 moved to 10 microAmp beam
18:41 starting to take DL2 data
20:00 looking at Ctime , noticed we have a problem in the coinc time window.
21:00 after consulting with Bob M it was suggested that we need to change our timming , we called MCC and asked for controled access.
22:15 fix done .. now waiting for beam
22:20 Beam is back 10 microAmp rastered
24:00 still taking data