    Log entry time 08:13:24 on January13,2005

    Entry number 139138

    keyword=Run/Shift Summary

    Configuration: D1
    Target tilted Carbon
    00.00-00:12 Run 1760, (Current increased from 5 to 25uA), 21k
    00:13-01:00 Run 1761, 300k
    01:01-01:43 Run 1762, 300k
    01:46-02:32 Run 1763, 300k
    02:33-03:15 Run 1764, ~250k

    Target changed to LD2, current reduced to 4.5uA
    03:29-3:58 Run 1765 170k

    03:58-04:21 Beam off (RF-trip-problem)
    4:21 beam back
    MCC started tuning the beam.
    04:36-05:22 Run 1766, 300k
    05:24-06:08 Run 1767, 300k
    06:09-07.00 Run 1768,
    07.00: Beam stopped for beam study.
    Requested for controlled access for configuration change later this morning.