    14:03 start shift with run 1606
    ( 4cm LD2 with 2*2 raster ) at 34uA .
    17:54 end of run 1606 (300 k) .
    17:55 Called MCC to increase the current to 40uA.
    17:56 start run 1607 (200 k) .
    19:00 start run 1608 (200k ) .
    20:05 start run 1809 .
    20:10 MCC called.
    They have problem to deliver the beam (FSD problem ).It might take 10min .
    20:14 Beam Back .
    20:28 MCC called again. FSD problem and no beam in the Hall.
    20:56 Beam back .
    21:15 Beam keeps tripping off due 2KW FSD faults. MCC still working to fix this problem.
    21:55 run 1809 ended at 130k because ROC5 was not responding.
    22:09 Fixed the problem of ROC5 by rebooting the trigger supervisor (both ROC5 and trigger supervisor seems to be connected together).
    22:11 start run 1810 (200 k) .
    23:14 start run 1811 .
    23:57 run 1811 still running.