    Day Shift for Monday January 17th, 2005


    Leader:   B. Moffit
    Target:   J.P. Chen
    Worker:   B. Sawatsky
    Left HRS p0   = -3.7620 GeV/c   Angle = 19.5°
    Right HRS p0  = +1.4500 GeV/c   Angle = 40.1°
    BigBite Gaussmeter  = 0.9325 T  Angle = 98.0°

    Summary

    Most downtime from the controlled access to investigate target vacuum fluctuations and trigger timing issues. Had some DAQ problems.. (halog entries 139483 and 139488)... might have been correlated with several xscaler processes running (Bob killed them off, and we restarted one on a machine in the control room. Halog entries 139491 and 139492). JP also noticed some curious scattering chamber vacuum fluctuations (halog entries 139459, 139460, 139469, and 138489)

    Significant Events

    • 08:00 Began the shift by ending Run 1867, moving to the slanted carbon target, and turning on the Bigbite HV. Asked MCC for 15µA (un-rastered), and adjusted prescale factors.
    • 11:26 Requested controlled access (halog entry 139458)
    • 13:19 Back from access, requested a few different currents of unrastered beam to check rates and set prescale factors.
    • 15:23 Rebooted the trigger supervisor crate in the Left arm, using the Slow Controls screen, to try to alleviate the DAQ problem.
    • 15:35 MCC informs us that an RF zone has dropped out, and beam will not be back for a few minutes (experts are working on it).
    • 15:54 Beam returns (0.5µA, un-rastered on slanted carbon).

    Data Run Summary

    • 08:38 Run 1868 - Production Run (Slanted Carbon).
    • 09:14 Run 1869 - Production Run (Slanted Carbon). Set PS6 to 500 (this run only).
    • 09:22 Run 1870 - Production Run (Slanted Carbon). Returned PS6 to 99999.
    • 10:24 Run 1871 - Production Run (Slanted Carbon).
    • 11:21 Run 1872 - Production Run (Slanted Carbon).
    • Run 1873 through 1881 - Junk.. DAQ tests for T4.
    • 13:28 Run 1882 - BB aux timing check (Slanted Carbon). ~2µA.
    • 13:39 Run 1883 - Junk (Slanted Carbon). Low CODA rate, high deadtime. End of run failed.
    • 13:50 Run 1884 - BB aux timing check (Slanted Carbon). ~4µA.
    • 14:00 Run 1885 - Junk (Slanted Carbon). Start of run failed.
    • 14:08 Run 1886 - BB aux timing check (Slanted Carbon). ~8µA.
    • 14:26 Run 1887 - Junk (Slanted Carbon). Start of run failed.
    • 14:31 Run 1888 - BB aux timing check (Slanted Carbon). ~15µA.
    • 14:52 Run 1889-1895 - Junk (Slanted Carbon). Start of runs failed (TS1 troubles).
    • 15:54 Run 1896 - BB aux timing check (Slanted Carbon). ~0.5µA.