Main INDEX
Monthly INDEX
PREV
NEXT
User name LeRose
Log entry time 16:00:44 on January19,2005
Entry number 139656
keyword=Shift Summary
Day shift 19 January 2005
John LeRose (SL)
Lingyan Zhu (TO)
Brad Sawatzky (3rd)
No beam at start of shift
Left arm: 3.762 GeV/c 19.5 degrees (N)
Right arm: 1.45 GeV/c 40 degrees (P)
BigBite 0.932 T ~98 degrees
08:50 beam back started data taking
11:56 MCC calls to tell us they'll be down for "a few minutes" with a magnet problem. (Already back up and cycling). We just let run 1947 continue.
12:06 still no beam. We end run 1947.
12:22 Beam finally back. (MCC speak: "a few minutes" = half hour)
12:34 MCC has RF problem. Have called someone in to check on it. Might only be "a few minutes".
12:48 MCC says another 15-20 minutes.
13:02 Beam back
Just continuous data taking till end of shift
run summary
Production running 12C F1
1945 08:50-10:02 250K
1946 10:02-10:16 250K
1947 10:16-12:06 117k Ended because no beam.
1948 12:22-12:34 31K no beam
1949 13:02-14:18 250K
1950 14:19-15:38 250K
1951 15:39- Continues into swing shift