    Day shift 19 January 2005
    John LeRose (SL)
    Lingyan Zhu (TO)
    Brad Sawatzky (3rd)

    No beam at start of shift
    Left arm: 3.762 GeV/c 19.5 degrees (N)
    Right arm: 1.45 GeV/c 40 degrees (P)
    BigBite 0.932 T ~98 degrees

    08:50 beam back started data taking

    11:56 MCC calls to tell us they'll be down for "a few minutes" with a magnet problem. (Already back up and cycling). We just let run 1947 continue.
    12:06 still no beam. We end run 1947.
    12:22 Beam finally back. (MCC speak: "a few minutes" = half hour)
    12:34 MCC has RF problem. Have called someone in to check on it. Might only be "a few minutes".
    12:48 MCC says another 15-20 minutes.
    13:02 Beam back
    Just continuous data taking till end of shift

    run summary
    Production running 12C F1
    1945 08:50-10:02 250K
    1946 10:02-10:16 250K
    1947 10:16-12:06 117k Ended because no beam.
    1948 12:22-12:34 31K no beam
    1949 13:02-14:18 250K
    1950 14:19-15:38 250K
    1951 15:39- Continues into swing shift