    User name Moffit

    Log entry time 08:54:45 on January 20, 2005

    Entry number 139705

    keyword=Day Shift Summary

    Day Shift for Thursday January 20th, 2005


    Leader:   B. Moffit
    Target:   L. Zhu
    Worker:   E. Voutier
    Left HRS p0   = -3.7620 GeV/c   Angle = 19.5°
    Right HRS p0  = +1.4500 GeV/c   Angle = 40.1°
    BigBite Gaussmeter  = 0.9325 T  Angle = 98.0°

    Summary

    Short shift due to beam studies. L. Zhu stays to watch the target.
    I'll remain on site, and can be paged if beam will return during this shift.

    Significant Events

    • 08:00 Began the shift by starting Run 1967, beam current at ~20µA, un-rastered, on slanted 12C.
    • 08:34 Beam delivery stops for beam studies.
    • 08:50 ARM arrives and begins Hall survey.

    Data Run Summary

    • 08:00 Run 1967 - Production Run (Slanted Carbon).