Leader: B. Moffit
Target: L. Zhu
Worker: E. Voutier
Left HRS p0 = -3.7620 GeV/c Angle = 19.5°
Right HRS p0 = +1.4500 GeV/c Angle = 40.1°
BigBite Gaussmeter = 0.9325 T Angle = 98.0°
Summary
Short shift due to beam studies. L. Zhu stays to watch the target.
I'll remain on site, and can be paged if beam will return during this shift.
Significant Events
- 08:00 Began the shift by starting Run 1967, beam current at ~20µA, un-rastered, on slanted 12C.
- 08:34 Beam delivery stops for beam studies.
- 08:50 ARM arrives and begins Hall survey.
Data Run Summary
- 08:00 Run 1967 -
Production Run (Slanted Carbon).

|