Shift Summary:
Steady production for 6 hours. Beam was down for two hours.
16:00 Begin shift taking production run 2012
20:00 Still taking production
21:30 MCC has injector problem - will investigate
22:05 Still no beam - engineer is coming in, no time estimate
22:46 Engineer is still "troubleshooting." Perhaps another hour.
23:16 Attempting to restore beam.
23:22 Beam is back. Spot++ check looks OK. Begin production.
Run Summary
2012 Production (250k)
2013 Production (250k)
2014 Production (250k)
2015 Production (250k)
2016 Production (250k)
2017 Production (217k) injector problem
2018 Cosmics
2019 Production