    User name B. Craver

    Log entry time 23:35:48 on January22,2005

    Entry number 139851

    keyword=Swing Shift Summary

    Shift Summary:
    Steady production for 6 hours. Beam was down for two hours.

    16:00 Begin shift taking production run 2012
    20:00 Still taking production
    21:30 MCC has injector problem - will investigate
    22:05 Still no beam - engineer is coming in, no time estimate
    22:46 Engineer is still "troubleshooting." Perhaps another hour.
    23:16 Attempting to restore beam.
    23:22 Beam is back. Spot++ check looks OK. Begin production.

    Run Summary
    2012 Production (250k)
    2013 Production (250k)
    2014 Production (250k)
    2015 Production (250k)
    2016 Production (250k)
    2017 Production (217k) injector problem
    2018 Cosmics
    2019 Production