Leader: Guy Ron
Target:
Data: Ramesh S.
Left HRS p0 = -3.7620 GeV/c Angle = 19.5°
Right HRS p0 = +1.4500 GeV/c Angle = 40.1°
BigBite Gaussmeter = 0.9325 T Angle = 98.0°
Summary
Nothing out of the ordinary. Took steady 20µA Data.
Shift Events
- 23:45 Started Shift a few minutes early. The
current run is 2019 (a production run).
- 07:45 MCC called and said they will be down
for a while, they are having problems, cannot give an estimate yet for
how long the beam will be down..
Data Run Summary
- Run 2019 -
Production Run.
- Run 2020 -
Production Run.
- Run 2021 -
Production Run.
- Run 2022 -
Production Run.
- Run 2023 -
Production Run.
- Run 2024 -
Production Run.
- Run 2025 -
Production Run.
- Run 2026 -
Production Run.
- Run 2027 -
Production Run.
|