    User name B. Craver

    Log entry time 15:53:04 on January23,2005

    Entry number 139890

    keyword=Day Shift Summary

    Shift leader: B. Craver
    3rd: J. Watson

    Shift Summary: 5.5 hrs of production on slanted carbon target. Beam was down for 2.5 hrs.

    08:00 Begin shift with no beam.
    08:55 MCC calls, they have called in additional help. Perhaps 1-2 more hrs of downtime.
    10:35 Beam is restored, begin production, continue through end of shift.


    Run Summary

    2028 Production (250k)
    2029 Production (250k)
    2030 Production (250k)
    2031 Production (250k)
    2032 Production (250k)
    2033 Production