Leader: Guy Ron
Target:
Data: Ramesh S.
Left HRS p0 = -3.7620 GeV/c Angle = 19.5°
Right HRS p0 = +1.4500 GeV/c Angle = 40.1°
BigBite Gaussmeter = 0.9325 T Angle = 98.0°
Summary
Nothing out of the ordinary. Took steady 20µA Data.
Shift Events
- 00:00 Started shift with run 2044 going
(production run).
- 02:10 MCC Called, they are
having problems with an RF cavity, should take ~5-10 minutes to get beam
back.
- 02:25 Got beam back.
Data Run Summary
- Run 2044 -
Production Run on Slanted Carbon target at 20µA..
- Run 2045 -
Production Run on Slanted Carbon target at 20µA..
- Run 2045 -
Production Run on Slanted Carbon target at 20µA..
- Run 2046 -
Production Run on Slanted Carbon target at 20µA.
Cut short because of beam loss.
- Run 2047 -
Production Run on Slanted Carbon target at 20µA.
- Run 2048 -
Production Run on Slanted Carbon target at 20µA.
- Run 2049 -
Production Run on Slanted Carbon target at 20µA.
- Run 2050 -
Production Run on Slanted Carbon target at 20µA.
- Run 2051 -
Production Run on Slanted Carbon target at 20µA.
- Run 2052 -
Production Run on Slanted Carbon target at 20µA.
|