User name Eric Voutier
Log entry time 23:48:06 on January25,2005
Entry number 140044
keyword=Shift Summary
New Crew on shift: Vincent Sulkosky, Eric Voutier
-----------------
16:00 Coming on shift while Q1 is recovering from a trip, beam
studies are continuing.
17:55 Work in the hall is finished; going back to beam permit while
accerelator have problems in the injector (Hall C laser)
19:05 Beam back, HARP scan gives X x Y = 45 um x 116 um similar to
previous values; the raster profile was measured first and found to
be 500 um x 500 um at the BPM closest to the target. SPOT++ gives
1.3 x 1.3 mm
HARP scan runs 2071 and 2072 (arc files)
19:14 back to production data on 15 cm LD2 / 10 uA
21:50 ROC5 problems / kcoda / reboot guy / goes ok
21:55 Back to data production
Run History
-----------
2083 ..... 10uA LD2, 193k, very unstable beam, good run
2084 ..... 5uA LD2, about 120k, ROC5 problems at the end, good run
2085 ..... 5uA LD2, good run
2086 ..... 5uA LD2, good run
2087 ..... 5uA LD2, goes to next shift