    User name Eric Voutier

    Log entry time 23:48:06 on January25,2005

    Entry number 140044

    keyword=Shift Summary


    New Crew on shift: Vincent Sulkosky, Eric Voutier
    -----------------

    16:00 Coming on shift while Q1 is recovering from a trip, beam
    studies are continuing.

    17:55 Work in the hall is finished; going back to beam permit while
    accerelator have problems in the injector (Hall C laser)

    19:05 Beam back, HARP scan gives X x Y = 45 um x 116 um similar to
    previous values; the raster profile was measured first and found to
    be 500 um x 500 um at the BPM closest to the target. SPOT++ gives
    1.3 x 1.3 mm
    HARP scan runs 2071 and 2072 (arc files)

    19:14 back to production data on 15 cm LD2 / 10 uA

    21:50 ROC5 problems / kcoda / reboot guy / goes ok

    21:55 Back to data production


    Run History
    -----------

    2083 ..... 10uA LD2, 193k, very unstable beam, good run
    2084 ..... 5uA LD2, about 120k, ROC5 problems at the end, good run
    2085 ..... 5uA LD2, good run
    2086 ..... 5uA LD2, good run
    2087 ..... 5uA LD2, goes to next shift