    User name Eric Voutier

    Log entry time 00:00:15 on January28,2005

    Entry number 140174

    keyword=Shift summary


    New crew on shift: Lisa Kaufman, Vina Punjabi, Eric Voutier
    -----------------

    16:00 Beam studies are still going on and some work on the HVs
    is going on in the hall.

    17:00 MCC ask for people going out of the hall in order to send
    test beam. They will then go back in the hall to work of the HV
    crates (damaged cards, possibly because of radiations).

    18:50 Going back to controlled access and the HV crates.

    19:40 Eugene is coming too for some operation on the Moller.

    21:07 Steeve came in to work on thr HV crate (still a lot of
    problems)

    23:15 HV problem finally solved and trace back to the crate itself
    Work is still going on the Moller electronics.

    23:30 Setting up for Moller measurement