• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Ramesh

    Log entry time 08:45:02 on January28,2005

    Entry number 140213

    keyword=Run/Shift Summary





    Owl Shift Summary











    Shift Crew:  John Annand and Ramesh Subedi



    Left HRS (electron) p0 = 3.7620 GeV/c    Angle = 19.5°

    Right HRS (proton) p0  = 1.4500 GeV/c    Angle = 40.1°
    BigBite Magnet Current = 518 A           Angle = 99.0°
    BigBite Gaussmeter     = 0.9325 T  
    All production runs with tilted carbon at 10 µA un-rastered current.





    Shift Summary











    • 00:00             Started shift with "Moller Crew" doing Moller measurement


    • 01:25             Moller measurement finished (see halog entry 140178 by Eugene)



    • 01:25             Asked MCC for 2 µA beam.They had problem with one of their Quads, could not send beam for us.


    • 01:42             Beam back, started spot check for various targets at 2 µA current with no rastor (except for dummy target)


    • 01:54 - 02:06 Checked beam spot with epmpty target (see halog entry 140182 ).


    • 02:07 - 02:18 Target changed to LD2-15cm


    • 02:19             Checked beam spot with LD2 15cm target (see halog entry 140186 ) .



    • 02:23 - 02:26 Target changed to LH2-15cm


    • 02:27              Checked beam spot with LH2 15cm target (see halog entry 140189 ).



    • 02:33 - 02:37  Target changed to Dummy


    • 02:37               Spot check at Dummy target with 0.75x0.75 raster at 2 µA beam. MCC told COO does not                                       allow un-rastered beam delivery on Dummy target (see halog entry 140192 ).



    • 02:39 - 02:42  Target changed to slanted carbon


    • 02:43               Requested for 10 µA beam with no raster.


    • 02:49 - 03:44  Run 2129, fFirst production run of this shift.


    • 03:44 - 04:09  Run 2130, stopped early due to beam stop call from MCC due to RF problem.



    • 04:23              MCC called they are ready to give us beam.


    • 04:26              Beam back


    • 04:26 - 05:19  Run 2131


    • 05:19 - 06:16  Run 2132


    • 06:16 - 06:46  Run 2133, stopped early due to beam stop call from MCC due to RF problem.


    • 06:55               MCC called they are going to give us beam.

    • 07:00               Beam back.




    • 07:00 - 07:08  Run 2134, stopped early due to beam-stop call from MCC due to RF-cavity problem again.


    • 07:11               MCC called they are going to give us beam.



    • 07:13               Beam back


    • 07:13 -              Run 2135 passed to Day shift.










    Run Summary




  • 01:54 Run 2124 -
    Spot check run on empty target

  • 02:07 Run 2125 -
    Spot check run on empty target again.



  • 02:19 Run 2126 -
    Spot check run on LD2 target .


  • 02:27 Run 2127 -
    Spot check run on LH2 target.


  • 02:37 Run 2128 -
    Spot check run on Dummy target




  • Production runs on tilted carbon target:



  • 01:54 Run 2129 -
    Production run ( 200k).


  • 01:54 Run 2130 -
    Production run ( 61.9k).


  • 01:54 Run 2131 -
    Production run ( 200k).


  • 01:54 Run 2132 -
    Production run ( 200k).

  • 01:54 Run 2133 -
    Production run ( 100k).


  • 01:54 Run 2134 -
    Junk ( 9k).

  • 01:54 Run 2135 -
    Passed to Day shift.