Shift Crew: Steve Wood and Ramesh Subedi
Left HRS (electron) p0 = 3.7620 GeV/c Angle = 19.5°
Right HRS (proton) p0 = 1.4500 GeV/c Angle = 40.1°
BigBite Magnet Current = 518 A Angle = 99.0°
BigBite Gaussmeter = 0.9325 T
Shift Summary
- 00:00 Started the shift with run no 2150 passed from Swing Shift
- 00:18 - 01:13 Run 2151
- 01:14 - 01:28 Run 2152, stopped early do to RF-cavity problem.
- 01:28 Changed target to Empty-target.
- 01:52 Beam back
- 01:52- 01:56 Run 2153 with empty target to test BigBite detector scalar rates
- 01:56 -01:58 Moved the target back to slanted carbon
- 01:59 - 02:54 Run 2154
- 02:58 - 03:52 Run 2155
- 03:53 - 04:51 Run 2156
- 04:52 - 05:50 Run 2157
- 05:50 - 06:49 Run 2158
- 06:50 - 7:54 Run 2159
- 08:00 - Run 2160, passed to Day Shift
All time of the Shift saw excellent beam.
Run Summary
All production runs with C-tilted at 10µA with un-rastered beam in the F1 kinematics.
from last shift Run 2150 -Production run (200k)
00:18 Run 2151 -Production run (200k)
01:13 Run 2152 -Production run (37k)
01:56 Run 2153 -ND scalers test run with Empty target
01:59 Run 2154 -Production run (200k)
02:58 Run 2155 -Production run (200k)
03:53 Run 2156 -Production run (200k)
04:52 Run 2157 -Production run (200k)
05:50 Run 2158 -Production run (200k)
06:50 Run 2159 -Production run (200k)
08:00 Run 2160 -Passed to Day Shift
|