    Log entry time 08:00:34 on January29,2005

    Entry number 140279

    keyword=Run/Shift Summary






    Owl Shift Summary
    (29th Jan,05)









    Shift Crew:  Steve Wood and Ramesh Subedi



    Left HRS (electron) p0 = 3.7620 GeV/c    Angle = 19.5°

    Right HRS (proton) p0  = 1.4500 GeV/c    Angle = 40.1°
    BigBite Magnet Current = 518 A           Angle = 99.0°
    BigBite Gaussmeter     = 0.9325 T  






    Shift Summary











    • 00:00             Started the shift with run no 2150 passed from Swing Shift


    • 00:18 - 01:13              Run 2151


    • 01:14 - 01:28             Run 2152, stopped early do to RF-cavity problem.

    • 01:28 Changed target to Empty-target.


    • 01:52 Beam back

    • 01:52- 01:56 Run 2153 with empty target to test BigBite detector scalar rates


    • 01:56 -01:58  Moved the target back to slanted carbon


    • 01:59 - 02:54  Run 2154



    • 02:58 - 03:52 Run 2155


    • 03:53 - 04:51 Run 2156



    • 04:52 - 05:50 Run 2157



    • 05:50 - 06:49 Run 2158


    • 06:50 - 7:54  Run 2159


    • 08:00 -  Run 2160, passed to Day Shift



    • All time of the Shift saw excellent beam.








    Run Summary




    All production runs with C-tilted at 10µA with un-rastered beam in the F1 kinematics.

  • from last shift Run 2150 -Production run (200k)


  • 00:18 Run 2151 -Production run (200k)


  • 01:13 Run 2152 -Production run (37k)


  • 01:56 Run 2153 -ND scalers test run with Empty target


  • 01:59 Run 2154 -Production run (200k)


  • 02:58 Run 2155 -Production run (200k)


  • 03:53 Run 2156 -Production run (200k)


  • 04:52 Run 2157 -Production run (200k)


  • 05:50 Run 2158 -Production run (200k)


  • 06:50 Run 2159 -Production run (200k)


  • 08:00 Run 2160 -Passed to Day Shift