Main INDEX
Monthly INDEX
PREV
NEXT
User name jpchen
Log entry time 16:04:44 on January31,2005
Entry number 140413
keyword=day shift summary
1/31/05 day shift summary:
S.L.: J.P. Chen
3rd: J. Watson
8:00 continue data taking 10 uA on 12C (slanted).
L_HRS: P = 3.762 GeV/c; angle = 19.5 degrees
R_HRS: P = 1.450 GeV/c; angle = 40.1 degrees
BigBite: 518 A/0.932 T; 99 degrees.
run 2213, 7:47-8:43, 200K
run 2214, 8:44-9:06, 62.7K.
9:00 beam off for beam study.
11:00 controlled access to move the spectrometers: right to 12.5,
left to 15 degrees and move the BigBite to 70 degrees.
13:00 Controlled access ended. Back to power permit.
15:00-15:30 MCC put Hall A in controlled access for some work
ESS needed to do in Hall A. Back to power permit.
16:00 in beam permit. pass change from 4 to 1 is still on-going.