• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jpchen

    Log entry time 16:04:44 on January31,2005

    Entry number 140413

    keyword=day shift summary

    1/31/05 day shift summary:

    S.L.: J.P. Chen
    3rd: J. Watson

    8:00 continue data taking 10 uA on 12C (slanted).
    L_HRS: P = 3.762 GeV/c; angle = 19.5 degrees
    R_HRS: P = 1.450 GeV/c; angle = 40.1 degrees
    BigBite: 518 A/0.932 T; 99 degrees.

    run 2213, 7:47-8:43, 200K
    run 2214, 8:44-9:06, 62.7K.

    9:00 beam off for beam study.
    11:00 controlled access to move the spectrometers: right to 12.5,
    left to 15 degrees and move the BigBite to 70 degrees.
    13:00 Controlled access ended. Back to power permit.
    15:00-15:30 MCC put Hall A in controlled access for some work
    ESS needed to do in Hall A. Back to power permit.
    16:00 in beam permit. pass change from 4 to 1 is still on-going.