User name E.Chudakov

Log entry time 23:59:40 on January31,2005

Entry number 140463

keyword=Shift summary - swing

Shift crew: E.Chudakov, Yi Qiang, O.Glamazdin

16:30 - pulsed beam appears.
16:45 - failed to move the HRSL collimator, asked for control access.
18:10 - collimator fixed (in SIEVE position), back to beam permit
18:20 - CW beam in the hall: 5µA 1.2043 GeV/c
18:40 - Beam size 74 x 142 µm at 4B
21:40 - Control access to reset the BigBite VME crate


Runs target HRSL angle events comment
2217 empty 1.137 15 200k JUNK BigBite,NeutronD - on
2223 LH 4cm same 15 200k JUNK BigBite - on, NeutronD - off
2224 the same JUNK
2226 empty 1.137 15 200k NeutronD on
2227 C12 1.137 15 200k NeutronD off
2228 same
2229 LH 4cm 1.137 15 400k
2230 LH 4cm 1.137 15 400k
2231 LH 4cm 1.137 17 300k
2232 LH 4cm 1.137 17 300k
2233 C12 1.137 17 300k
2234 C12 1.137 17 300k