Main INDEX
Monthly INDEX
PREV
NEXT
User name Nilanga
Log entry time 08:00:52 on March 9,2005
Entry number 140942
keyword=Shift Summary
3.15 Beam in hall, start harp scans, beam center etc
beam size 87 um x 112 um
4.00 Ramped up the Bigbite current to 518 A, while MCC monitored the beam on dump. No change in beam was observed.
4.10 Moved to no target; run with 5 uA
4.20 Moved to slanted 12C target
5.30 While data being analyzed for the gain matching, a test run on LH2
6.30 Moving to momentum scan while waiting for analysis: 5 uA gives 250kHz on left arm; take only 3 uA, or 2 uA
6.35 Start momentum scan
Run # target PS3 PS6
2470 empty 1 2
2471 sla. C 120 500
2472 junk
2473 4cm LH2 1000 20
Momentum scan:
Run # angle P0 target current
2474 15 1.137 LH2 3 uA
2475 15 LH2 2 uA
2476 15 sla.12C 2 uA
2477 15 sla.12C 2 uA