Main INDEX
Monthly INDEX
PREV
NEXT
User name Annand
Log entry time 08:13:14 on March11,2005
Entry number 141192
keyword=Hall-A Owl Shift Summary
Problems
Shifted started with a power-supply problem on Q1.
Controlled access necessary to reset the PSU.
Q2 tripped off, but was reset using the standard
GUI tool.
BigBite QDCs giving errors. Reboot(s) of ROC5
did not clear the problem. Controlled access necessary
to power-cycle the crate....this cleared front-panel error lights
Detector Configuration x>1 d
LHRS 19.5 deg., P0=3.762 GeV
BB -97.6 deg., P=0.324 GeV
Neutron -97.6 deg., P=0.324 GeV
Perform Harp scan, 5uA
Set up 2x2 raster, 5uA on BeO target
Switch to 4cm LD2 target
Start scan of BB and Neutron rates vs beam current...
5uA, 10uA, 15uA, 20uA
Stop at 20uA...so not to exceed approx 1MHz on BB dE counters
Run Summary
2557 (?k events) Raster Check
2558 (?k events) Raster Check
2559 No record, ROC5 rebooted
2560 (50k events) 5uA on LD2 (No BigBite QDC)
2561 (50k events) 10uA on LD2 (No BigBite QDC)
2562 (50k events) 15uA on LD2 (No BigBite QDC)
2563 (50k events) 20uA on LD2 (No BigBite QDC)
ROC5 rebooted
2564 (?k events) 20uA on LD2 (No BigBite QDC)
2565 (?k events) 20uA on LD2 (No BigBite QDC)
ROC5 PSU cycled
2566 (?k events) Check BigBite QDCs working
2567 (50k events) 20uA on LD2 (BigBite OK)
2568 (200k events) 20uA on LD2 (BigBite OK)
2569 (200k events) 20uA on LD2 (BigBite OK)