User name Ramesh
Log entry time 08:08:57 on March20,2005
Entry number 141997
keyword=Shift Summary
00:00 Started shift with the Run 2813 from previous shift.
All shift production runs in
00:15-00: 00:50 Run 2814 (146k)
00:47 left Q1 tripped due to instantaneously zero level of Helium flow. In a minute the flow went to normal.
Could not reset Q1 remotely. In the meantime MCC called that the beam will be off due to Hall B problem. Called Peter.Concluded to request controlled access to reset Q1 manually from the hall.
02:15 came out of hall resetting Q1 (went into the hall with Peter).
02:28 went to beam permit
02:32 Q1 back to normal, asked for beam, MCC said it might take 5 or 7 minutes more since the Hall B problem still persits (which was the cause of taking beam away).
02:40 beam back.
02:40-03:27 Run 2815 (200k)
03:27-03:55 Run 2816 (122k)
03:55 Q1 tripped again. Helium level drops off to zero and comes back to normal condition in a matter of minute causing the Q1 trip.
Run 2817 junk
04:32 Requested 40uA beam
04:34-05:21 Run 2818 (200k)
05:22-05:29 Run 2819 (30k)
05:30 Q1 tripped (third time), could not reset from counting room,requsted escorted access
06:09 Q1 back after mannual reset in hall, requested 40uA beam.
06:10-06:54 Run 2820(200k)
06:54-07:37 Run 2821(200k)
07:37- Run 1822 passed to day shift.